New Pump at Centre Bridge Installed
March 30, 2016
The new pump was installed in the Delaware River at Centre Bridge this morning. It’s pumping away nicely with about a foot of water accumulated in back of the Centre Bridge Inn in about an hour. It will produce a greater volume of water more efficiently. The installation is a collaboration among the Friends of the Delaware Canal, New Hope for Our Canal, and PA Department of Natural Resources.